Selected projects

  • Installation of the biomass-fired 3 MW hot-water boiler, design and construction of the power distribution cabinet for the boiler room, construction of electrical installations and power distribution cabinets in 5 heating stations...

    Construction of biomass power plant for the Lepoglava Penitentiary
  • Reconstruction of the existing steam boiler room as part of the project “Energy renovation of the Dr. Tomislav Bardek Hospital in Koprivnica”. Design and construction of power distribution cabinets for controlling the boiler room’s steam...

    Reconstruction of the steam boiler room in Tomislav Bardek Hospital in Koprivnica
  • Construction of the biomass-fired boiler room for technological production purposes, installation of the high-pressure biomass-fired steam boiler with 5 t/h capacity. Design and production of power distribution cabinets for controlling...

    Construction of the biomass-fired boiler room in the factory “Danica - meat industry” in Koprivnica.

    Construction of the biomass-fired boiler room in the factory “Danica - meat industry” in Koprivnica.

  • Reconstruction of the boiler room and installation of a new steam boiler, production and installation of the power distribution cabinet and equipment for visualization of the steam plant with 6 t/h of process steam in the laundry service in Makarska.

    Reconstruction of the boiler room and installation of a new steam boiler, production of 6 t/h steam plant control system

    Reconstruction of the boiler room and installation of a new steam boiler, production of 6 t/h steam plant control system

  • Reconstruction of the steam boiler room, introducing gas instead of heating oil as an environmentally more acceptable energy source, design and production of a power distribution cabinet in the steam plant.

    Production and installation of cabinet and visualization equipment for the steam plant of the laundry room of TURISTHOTEL d.d. in Zadar

    Production and installation of cabinet and visualization equipment for the steam plant of the laundry room of TURISTHOTEL d.d. in Zadar

  • Gasification and reconstruction of the hot-water boiler room with 11 MW total power, design and construction of power distribution cabinets for boiler room control. Changing the energy source, transition from heating oil...

    Gasification and reconstruction of the boiler room in Samobor

    Gasification and reconstruction of the boiler room in Samobor

  • Installation of PLC devices for automatic control of the gas reducing and metering station (GRMS) of the Jertovec combined-cycle power plant (CCPP), implementation of the technical...

    Overhaul of the energy and control equipment in the GRMS of the Jertovec CCPP

    Overhaul of the energy and control equipment in the GRMS of the Jertovec CCPP

  • Increasing energy efficiency, saving on energy consumption, annual savings on heating and hot water preparation costs, reduction of CO2 emissions.

    Reconstruction of the boiler room in the Croatian Institute of Transfusion Medicine (CITM) in Zagreb
  • Works on boiler room reconstruction, installation of hot-water boilers with 2.5 MW total power and related equipment, installation of 50 solar panels for domestic hot water preparation.

    Reconstruction of the boiler room in the Birth and Women’s Clinic of the Zagreb University Hospital Centre (KBC)
  • Works on boiler room reconstruction, installation of hot-water boilers with 1 MW total power, installation of high-temperature heat pumps and related equipment, installation of 120 solar panels for domestic hot water preparation.

    Performing works on reconstruction and modernization of the boiler room of Hotel Carolina, Rab
  • Works on reconstruction of the cooling system, installation of a water cooler with 2 x 600 kW total power and changing the main manifold with related equipment and transport pumps.

    Reconstruction of the cooling system in the complex of three business buildings in Zagreb
  • Installation of a 500-kW boiler that can burn woodchips or pellets, construction of a biomass storage facility and other equipment necessary for boiler room operation. Installation of a calorimeter for monitoring..

    Construction of the biomass-fired boiler room in the Primary School “Stjepan Basariček” in Ivanić-Grad

Certificates

MI MARIS d.o.o.

Ulica 65. bataljuna ZNG 15,
10310 Ivanić-Grad, Hrvatska

Phone
+385 1 26 41 800

Fax
+385 1 37 34 781

The site was co-financed by the European Union from the European Regional Development Fund

More information on the website: https://strukturnifondovi.hr/
The contents of this announcement are the sole responsibility of MI MARIS d.o.o.

Copyright 2019 MI MARIS d.o.o. All rights reserved