Construction of the biomass-fired boiler room in the factory “Danica - meat industry” in Koprivnica.

Investor:

Podravka d.d.

 

Project description:

Construction of the biomass-fired boiler room for technological production purposes, installation of the high-pressure biomass-fired steam boiler with 5 t/h capacity. Design and production of power distribution cabinets for controlling the boiler room.

 

Objective of the project:

Increasing energy efficiency, saving on energy consumption, reduction of heating costs and of CO2 emissions.


Year of completion:

2017