Selected projects

Construction of biomass power plant for the Lepoglava Penitentiary

Investor:
Funda d.o.o. for the Lepoglava Penitentiary, Environmental Protection and Energy Efficiency Fund


Project description:
Installation of the biomass-fired 3 MW hot-water boiler, design and construction of the power distribution cabinet for the boiler room, construction of electrical installations and power distribution cabinets in 5 heating stations as part of the project “Energy renovation of Lepoglava Penitentiary facilities”.

Objective of the project:
To increase the energy efficiency of the penitentiary building complex, save on energy consumption, and reduce heating costs and CO2 emissions.


Year of completion:
2016/2017

Gallery

Certificates

MI MARIS d.o.o.

Ulica 65. bataljuna ZNG 15,
10310 Ivanić-Grad, Hrvatska

Phone
+385 1 26 41 800

Fax
+385 1 37 34 781

The site was co-financed by the European Union from the European Regional Development Fund

More information on the website: https://strukturnifondovi.hr/
The contents of this announcement are the sole responsibility of MI MARIS d.o.o.

Copyright 2019 MI MARIS d.o.o. All rights reserved